Before you book an installer or put a deposit on a seated steam capsule, ask the supplier for a drawing and a written water and drainage schedule for the exact configuration. The schedule should show how the unit gets water, which components discharge water, and where the supplier’s scope ends. Have the installer price the site work against that same drawing. A quotation that says only “water and drain required” leaves both the job and its cost open.

Ask what each connection is for
The Fulian seated capsule listing identifies steam equipment, water handling and end-of-session work as model-specific. It provides a family description, so a buyer still needs the actual model’s installation and operating documents. Two U.S. steam equipment examples illustrate why a drain label alone is vague. ThermaSol’s generator support page describes an incoming water connection and a drain for the pan under the generator. MrSteam describes an automatic cycle that drains water from its generator after a delay. A pan connection and a generator flush perform different jobs. Those examples apply to the named systems. Use the capsule maker’s documents to establish what the quoted capsule requires.
| Field | Evidence to request | Cost or responsibility to assign |
|---|---|---|
| Water input | The exact model’s filling method and, where applicable, the location of the water inlet on the drawing. | Identify which parts arrive with the unit and what site preparation the installer needs to price. |
| Water discharge | A list of water outlets and their purpose, including any generator drain, containment pan or other outlet shown in the instructions. | Identify who provides each connection, what it discharges into and what work the quotation includes. |
| End of session | The written shutdown and room-reset sequence, including any automatic cycle and when it runs. | Assign staff tasks and distinguish regular equipment care from work handled by service personnel. |
Compare both quotes in the same room
Give suppliers the same room sketch, intended use and booking schedule. Suppose one bidder includes a documented drain accessory and an installer allowance, while another lists the base capsule and leaves the rest open. Have each bidder mark the connection points and excluded parts. Then ask the proposed installer to price the scope that remains. A difference in the equipment price says little about which proposal costs less once the unit is ready for handover.
If either offer lists an automatic drain or flush, ask when the cycle starts, what it services and what staff still do after a session. Put those answers beside the room-reset procedure. A later generator flush does not tell the buyer when the seat and other contact surfaces will be ready for the next booking. A staff walkthrough should cover both the room and the equipment using the written instructions.
Keep the quote and sign-off tied to the model
Before authorizing work, record the model and option identifiers, document versions and the person responsible for confirming each connection. At handover, have the qualified installer or supplier demonstrate the documented functions and record any unresolved item. Site rules and installation requirements depend on the location and equipment. This guide is for comparing quotations. It does not set pipe sizes, dictate how to route discharge or approve an installation. For the current catalog format and an equipment enquiry, see the TUOKE seated steam wellness capsule.
Sources
- Fulian, Seated Steam Capsule, catalog information dated 17 October 2026, reviewed 26 November 2026.
- ThermaSol, Water Supply and Drain Pan, updated 2 June 2026, reviewed 26 November 2026.
- MrSteam, AutoFlush, undated product reference, reviewed 26 November 2026.
Explore Wellness Capsules
Compare equipment formats and request documentation for the exact model and destination market.
Wellness Capsules product category